SurveyFy — Real Estate Topography

From boundary survey to recorded plat.

Subdivision plats, replats, lot splits, waivers of plat and condominium plats prepared by licensed Florida surveyors — with the boundary, the legal descriptions and the county submittals handled in one office, coordinated with your engineer and your attorney.

  • Licensed Florida PSM
  • Plats, replats & lot splits
  • County submittal ready
  • Quote within 24 hours

Miami-Dade, Broward, Palm Beach and the rest of South & Central Florida. Chapter 177 compliant.

Tell us about the project. Get scope and price within 24 hours.

Send the folio and what you want to do with the land. A licensed surveyor scopes the plat process and replies with a price and a schedule.

Prefer to talk it through first? Book a video call with a licensed surveyor.

No spam, no commitment. A licensed surveyor reviews every request. Or call (786) 574-6608 · WhatsApp

Boundary, plat, submittal — one surveyor, start to recording.

Platting is a process with the county as much as a drawing. We run it from the first boundary survey to the recorded plat so nothing falls between the surveyor, the engineer and the attorney.

  1. 01 · Boundary & research

    Title, record and field

    Boundary survey of the parent tract, title and record research, existing easements and encroachments — the foundation every plat is built on.

  2. 02 · Plat & legals

    Drawing and descriptions

    Tentative and final plat drawn to Chapter 177 and the county's platting manual, with lot and tract legal descriptions, dedications and the surveyor's certificate.

  3. 03 · Submit & record

    County review to recording

    Submittals, review comments and revisions handled with your engineer and the county; monuments set and certified for recording.

What SurveyFy prepares for your plat

Everything the county platting section, your engineer and your attorney need — drawn, described, monumented and sealed.

  • Boundary survey of the parent tract signed and sealed, with title research and existing easements
  • Tentative and final plat to Florida Chapter 177 and the county platting manual
  • Lot, tract and easement legal descriptions for the plat, the deeds and the title company
  • Waiver of plat and lot split documents sketch and legal descriptions in the county format
  • Monuments set and certified permanent reference monuments and lot corners for recording
  • Submittal package and revisions coordinated with your engineer through county review
Plat drawing of a townhouse subdivision with lots, tracts and right-of-way
Plat of a townhouse subdivision
Survey stakes with pink flagging set at a lot corner in Florida
Corners set and flagged for recording
SurveyFy crew launching a drone on an open field in Florida

Large tracts surveyed with drones and LiDAR — weeks faster.

A subdivision starts with a boundary and topographic survey of the whole tract. On multi-acre parcels we fly them, so your engineer has the existing conditions for the preliminary plat and the drainage design in days instead of weeks — on the same control the final plat will be monumented from.

  • Boundary + topographic survey of the parent tract for the tentative plat and civil design
  • Tree survey of the tract, which most counties require with the plat application
  • Construction staking of lots, roads and utilities once the plat is approved — same team, same control
Quote a subdivision package

For developers, engineers and the attorneys who close the lots.

We speak the county's language, coordinate with your civil engineer and deliver legal descriptions your title company accepts the first time.

20 counties, from the Keys to Tampa Bay.

We know the platting manuals of Miami-Dade, Broward and Palm Beach and work regularly with the platting sections in Central Florida. Tell us the county and the project and we'll walk you through the steps.

Crews based in Doral and downtown Miami. Orlando and Tampa Bay projects are scheduled weekly.

Trusted by builders, engineers and property owners across Florida

Questions we get before the first quote

Anything else? Call (786) 574-6608 — English and Spanish.

When do I need a plat and when is a waiver of plat enough?

It depends on the county and the zoning. Splitting a lot into two or combining lots can often be done with a waiver of plat or a lot split (a sketch and legal description plus the county application); creating several new lots, roads or tracts requires a subdivision plat under Florida Chapter 177. We tell you which applies before you spend money.

How long does the platting process take?

The survey and the plat drawing take weeks; county review takes months and varies by county. We give you a realistic schedule at the quote, and we handle the review comments with your engineer so the clock keeps moving.

Do you prepare condominium plats?

Yes — condominium and townhome plats and the exhibits for the declaration, coordinated with your attorney.

Do you set the monuments?

Yes. Permanent reference monuments and lot corners are set and certified as required for recording, by the same crew that surveyed the boundary.

What do you need to quote?

The folio, what you want to do with the land (how many lots, roads, tracts) and who else is involved (engineer, attorney). We reply within 24 hours with scope, price and schedule.

Send the folio. Get the plat scope and price within 24 hours.

A licensed surveyor tells you whether it is a plat, a replat or a waiver, what the county will ask for and what it costs.